Bando 9B80 Power King Combo, BM80 FHP Kits

Regular price $ 194.40
Tax included. Shipping calculated at checkout.
Description

Bando 9B80 Power King Combo, BM80 FHP KitsBando 9B80 To resolve problem applications where belts are flipping over or jumping out of the sheaves, utilize Bandos series of Combo belts. The tie band assures lateral rigidity and guides the belts into the sheave grooves. The tie band, reinforced with high strength transverse tensile cords, is fully oil and heat resistant and permanently welds the individual belts together. Combos utilize the premium quality Power King and Power Ace belts, with

2 a Front Face Code Resilient Mount Front Shaft Indicator None Heater Indicator No Heater Insulation Class F Inverter Code Not Inverter KVA Code M Lifting Lugs No Lifting Lugs Locked Bearing Indicator No Locked Bearing Motor Lead Exit Terminal Panel Motor Lead Termination Flying Leads Motor Lead Quantity/Wire Size 5 @ 18 AWG Motor Type 3428L Mounting Arrangement F1 Number of Poles 4 Overall Length 12

A PH Motor Type 3628L Mounting Arrangement F1 Number of Poles 2 Overall Length 16

Series EDP11 Panel type VFD Horsepower (HP) 10 HP Enclosure type Wall mount Thermal Managment None General enclosure options None Main voltage 230 V Control Voltage 120 V Frequency 60 Hz SCCR rating 5 kAIC Disconnect switch type Circuit Breaker rotary handle disconnect Bypass type None Control power transformer 100 VA - Open Reactor/Filter None Communication None Control options Start Pushbutton

EM2531T-5G SPEC

Cutler-HammerC25BNB240T

VEM3555T SPEC 35AA003M774G3 HP 2 VOLTS 208-230/460 AMPS 5

lb Locked rotor torque 280 % Breakdown torque 290 % Locked rotor time 12s (cold) 7s (hot) Moment of inertia (J) 0

5 % Electrically Isolated Bearing Not Electrically Isolated Feedback Device NO FEEDBACK High Voltage Full Load Amps 141

Bando - 10C144 To resolve problem applications where belts are flipping over or jumping out of the sheaves

TAG-INSTAL-MAINT no wire (2100bx)4/22 35FH4005A01SP IEC FH NO GREASER W/PRIMED

Amperes 1129 A LRC 7

Amperes 1185 A LRC 7

Easy Shipping

Quick Dispatch:

Your Bando 9B80 Power King Combo, BM80 FHP Kits orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 9B80 Power King Combo, BM80 FHP Kits ships.

Need Help?
Questions about Bando 9B80 Power King Combo, BM80 FHP Kits, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 9B80 Power King Combo, BM80 FHP Kits in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>